Resumo
The Bioganix in-vessel composting system at Leominster, UK, received 33 515 t of waste from January 2006 to December 2007, of which 9200 t was source-segregated biodegradable municipal waste (BMW). The process operated with a nominal in-vessel retention time of 4 days. Mass balances indicated 17·1% reduction (excluding reject materials). The process was estimated to consume 186 kWh/t of waste processed as electrical energy for static plant and a further 9·6 kWh as diesel for mobile plant. Taking into account transportation and application of the compost, the estimated consumption was ~560 kWh/t of waste processed, calculated as primary energy (including electrical conversion). 96·7% of this was for processing; transportation consumed 1·3% and application 2·0%. The mixed waste compost had a high nitrogen content but, for a typical source-segregated biodegradable municipal waste, the energy potentially offset from nitrogen fixation is likely to be considerably less than that used in processing.
| Idioma original | English |
|---|---|
| Título da publicação do anfitrião | Proceedings of the Institution of Civil Engineers-Waste and Resource Management |
| Editora | ICE Publishing Ltd. |
| Páginas | 151-159 |
| Número de páginas | 9 |
| Volume | 164 |
| Edição | 3 |
| DOIs | |
| Estado da publicação | Published - ago. 2011 |
ODS da ONU
Este resultado contribui para o(s) seguinte(s) Objetivo(s) de Desenvolvimento Sustentável
-
Sustainable cities and communities
-
Responsible consumption and production
Impressão digital
Mergulhe nos tópicos de investigação de “Mass and energy balance for a rotating-drum composting plant“. Em conjunto formam uma impressão digital única.Citar isto
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver