Resumen
Tidal current and wave power have made substantial progress towards commercialisation. Based on the successful testing of full-scale prototypes, pioneering tidal arrays are currently implemented by means of direct agreements between developers/investors and device manufacturers. The top-ranked risks for commercial projects (identified as achieving funding and uncertainty in device performance) are directly intercorrelated as investor confidence mainly depends on track records of continuous device operation. Before becoming recognised as a fully mature electricity generation method, marine energy needs to prove a range of referenceable project cases. The attainment of this array-scale success will represent a major turning point for the global marine energy business and is expected to finally trigger large-scale deployment.
| Idioma original | English |
|---|---|
| Páginas (desde-hasta) | 180-192 |
| Número de páginas | 12 |
| Publicación | International Journal of Marine Energy |
| Volumen | 13 |
| Fecha en línea anticipada | 5 jun 2015 |
| DOI | |
| Estado | Published - 1 abr 2016 |
ODS de las Naciones Unidas
Este resultado contribuye a los siguientes Objetivos de Desarrollo Sostenible
-
Affordable and clean energy
Huella
Profundice en los temas de investigación de 'Overcoming the Marine Energy Pre-Profit Phase: What Classifies the Game-Changing "Array-Scale Success?'. En conjunto forman una huella única.Citar esto
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver